Hi.
I have a variant configured material that transforms into a BOM in quotation once characteristics have been selected. I can reference the quote and copy the BOM, both header and lines into a new sales order but once I do that the part numbers of the lines of the BOM can't be changed.
For those trying to figure out a reason here it is: in SO I intend to use other materials but I need to maintain the connection between quote and SO AND the new materials have the p/n derived from those already in the BOM - for instance from a XXXXXX material in the BOM I will need to actually have XXXXXX11 in the order - so referencing makes it easy to fill in the right data.
Can I do the copy/reference but somehow have the part numbers modifiable?
Thank you.
Kat